Before delivery
- Confirm equipment capacity, attachments, and job scope.
- Share location pin, access width, gate restrictions, and working hours.
- Check ground bearing, slopes, underground utilities, and overhead hazards.
Safety and site readiness
Safe rentals start before mobilization. Use this checklist to prepare access, ground conditions, traffic movement, temporary power, and lifting requirements.
When requesting heavy equipment rental, include any tight access, lifting hazards, night work, permit timing, live traffic, shutdown schedules, or power restrictions so the rental package can be planned correctly.
Send Safety Requirements